Coca Cola, Kewdale WA

Coca Cola, Kewdale WA

Infinity Supply, Design, Project Manage Case Study with Coca Cola in 2010.

As part of their factory renovation, Coca Cola required a 40m airline system that could connect three 55kW variable speed compressors.

Infinity piping was utilised to ensure maximum capacity of these compressors and to optimise the flow of the airline system.

 

This Infinity installation was project managed by Gareth Spencer, Gareth is now located in Victoria and has over 7 years’ experience working with Infinity Pipe Systems. Whether you are in need of project management, technical information, design solutions, installation, or just some advice, contact Gareth today.

 


 

Case Studies , ,